Analisis Keseimbangan Lintasan Proses Produksi Roti Manis Kasur Kombinasi di PT. Indoroti Prima Cemerlang
Main Article Content
Abstract
PT Indoroti Prima Cemerlang is one of the Food industries which produces bread with a brand Mr. Bread. the company had problems with the balance of the production line, so that it cannot meet consumer demand, this causing the company to not able meet the production targets. The purpose of this study is to calculate the increase in line balancing and decrease in idle time and determine the optimum number of work stations in the production process of product sweetbread combination at PT. Indoroti Prima Cemerlang. The method used in this study was the Ranked Position Weight (RPW) method with the results obtained that the number of work stations is reduced to 5 work stations, the line efficiency increases to 40% and balance delay decreased to 60% with idle time reduced to 29.019 seconds.
Keywords : Line balancing, work station, idle time, balance delay, Ranked Position Weight
Downloads
Article Details
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi-BerbagiSerupa 4.0 Internasional.
Seluruh artikel di Jurnal ini dapat disebarluaskan atas tetap mencantumkan sumber yang syah. Identitas judul artikel tidak boleh dihilangkan. Penerbit tidak bertangggung jawab terhadap naskah yang dipublikasikan. Isi artikel menjadi tanggung jawab Penulis.