STUDI PERENCANAAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO PADA SALURAN IRIGASI DESA ANGANTAKA ABIANSEMAL BADUNG

Main Article Content

I Komang Ogik Parmana Putra Ida Ayu Dwi Giriantari I Nyoman Setiawan

Abstract

The utilization of renewable energy can be a solution to meet the current increasing demand for electrical energy in rural areas, one of which is the use of water energy with the development of PLTMH. In this study, the planning of a microhydro power plant was carried out in the irrigation canal of Angantaka Abiansemal Badung Village as a source of electrical energy to meet the needs of electrical energy. The Angantaka Village irrigation channel has a head 2,1 meters, a width of 1,95 meters, an average depth of 0,88 meters and a water discharge of 0,3045 m3/s. The PLTMH planning system uses a breastshot wheel type water wheel with an efficiency of 75% and TEK STC-5 kW 3 phase AC synchronous generator and a 6 kW ELC control panel. Planning for PLTMH on the irrigation canal of Angantaka Abiansemal Badung Village with a capacity of 3,76 kW / 4,70 kVA. The initial investment cost required is IDR. 72.055.375 with operational and maintenance cost of IDR. 720.553 in one year.

Downloads

Download data is not yet available.

Article Details

How to Cite
OGIK PARMANA PUTRA, I Komang; DWI GIRIANTARI, Ida Ayu; SETIAWAN, I Nyoman. STUDI PERENCANAAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO PADA SALURAN IRIGASI DESA ANGANTAKA ABIANSEMAL BADUNG. Jurnal SPEKTRUM, [S.l.], v. 10, n. 1, p. 1-10, mar. 2023. ISSN 2684-9186. Available at: <https://ojs.unud.ac.id/index.php/spektrum/article/view/99734>. Date accessed: 06 dec. 2024. doi: https://doi.org/10.24843/SPEKTRUM.2023.v10.i01.p1.
Section
Articles

Most read articles by the same author(s)

1 2 3 4 5 6 7 > >>