Perencanaan Pembangkit Listrik Tenaga Surya Hybrid Pada Area Parkir Gedung Dinas Cipta Karya, Dinas Bina Marga Dan Pengairan Kabupaten Badung

Main Article Content

Eric Timotius Abit Duka I Nyoman Setiawan Antonius Ibi Weking

Abstract

The increasing demand for electrical energy in Bali requires additional electrical energy supply, while conventional energy such as petroleum, coal and natural gas continue to be used. Therefore, the utilization of non-conventional energy like solar energy should be increased. One of provision of non-conventional electric energy which is ready to be widely used is using PLTS Photovoltaic technology. The data analysis in this study uses manual calculation method to calculate electric power requirement, setting the result for electrical power, calculating the amount and capacity for solar module and inverter, calculating slope angle and location of solar module. PLTS uses a hybrid system with PLN, which works automatically to be controlled by the inverter control system. PLTS capacity of 148,274 kW supply 30% of the electrical energy consumption in the building of 2,310 MWh.

Downloads

Download data is not yet available.

Article Details

How to Cite
ABIT DUKA, Eric Timotius; SETIAWAN, I Nyoman; IBI WEKING, Antonius. Perencanaan Pembangkit Listrik Tenaga Surya Hybrid Pada Area Parkir Gedung Dinas Cipta Karya, Dinas Bina Marga Dan Pengairan Kabupaten Badung. Jurnal SPEKTRUM, [S.l.], v. 5, n. 2, p. 67-73, dec. 2018. ISSN 2684-9186. Available at: <https://ojs.unud.ac.id/index.php/spektrum/article/view/44798>. Date accessed: 19 nov. 2024. doi: https://doi.org/10.24843/SPEKTRUM.2018.v05.i02.p09.
Section
Articles

Most read articles by the same author(s)

<< < 1 2 3 4 5 6 7 > >>