OPTIMASI PERENCANAAN SISTEM PEMBUMIAN PADA RENCANA PEMBANGUNAN GAS INSULATED SUBSTATION 150 KV PECATU

Main Article Content

Putu Quentin MP Cok Gede Indra Partha IGN Janardana

Abstract

The construction of the Gas Insulated Substation (GIS) 150 kV Pecatu is planned by PT. PLN
(Persero) to get electricity needs in the area of Pecatu, Badung Regency, Bali Province. The Gas
Insulated Substation (GIS) 150 kV Pecatu is located in a hilly area with a texture of limestone rocky
soil and the resulting soil type resistance is ? = 263.76 ohm-meter. The results of calculations for the
type of earthing system Plates earth resistance value of 0.95 ohms at a cost of Rp. 4,196,000,000, -
(Four Billion One Hundred Ninety Six Million Rupiah), for the type of Mesh earthing system no results
are obtained <1 ohm and for the Multi Grid-Rod earthing system type the grounding resistance value
is 0.876 ohms at a cost of Rp 3,753,120,000, - (Three Billion Seven Hundred Fifty Three Million One
Hundred Twenty Thousand Rupiah). The type of earthing system recommended is a Multi Grid-Rod
earthing system with a distance between parallel conductors (D) of 1 meter, depth of conductor
planting as deep as 4 meters above the ground surface, Rod electrode diameter of 0.015 meters, Rod
electrode length of 4 meters and total conductor length of 12500 meters.

Downloads

Download data is not yet available.

Article Details

How to Cite
QUENTIN MP, Putu; INDRA PARTHA, Cok Gede; JANARDANA, IGN. OPTIMASI PERENCANAAN SISTEM PEMBUMIAN PADA RENCANA PEMBANGUNAN GAS INSULATED SUBSTATION 150 KV PECATU. Jurnal SPEKTRUM, [S.l.], v. 7, n. 1, p. 123-130, mar. 2020. ISSN 2684-9186. Available at: <https://ojs.unud.ac.id/index.php/spektrum/article/view/60408>. Date accessed: 21 nov. 2024. doi: https://doi.org/10.24843/SPEKTRUM.2020.v07.i01.p18.