ANALISA SISTEM PENGAMAN GENERATOR PLTDG DI PT INDONESIA POWER UNIT PEMBANGKITAN BALI

Main Article Content

Putu Wira Asta Dharma Cok Gede Indra Partha Ngakan Putu Satriya Utama

Abstract

The need for electrical power, especially in Bali, is increasing every year. Therefore, the Bali’s Generating Unit of PT Indonesia Power has replaced the Diesel-powered Electrical Generator Pembangkit Listrik Tenaga Diesel (PLTD) with ‘the Gas-powered Diesel of Electrical Generator Pembangkit Listrik Tenaga Diesel Gas’ (PLTG). Such a replacement causes the change in the generating capacity power which affects the setting and system of protection. This current study was intended to analyze the relay protecting system using the short connecting simulation method in the ETAP program in order to be able to identify the maximum and minimum disturbing current, the working time setting and the OCR (Over Current Relay) and GFR (Ground Fault Relay) protecting coordination. Based on the result of simulation and calculation, it can be concluded that the OCR took 1.18 seconds to work, faster than the GFR, which took 2.25 seconds to work.

Downloads

Download data is not yet available.

Article Details

How to Cite
WIRA ASTA DHARMA, Putu; INDRA PARTHA, Cok Gede; SATRIYA UTAMA, Ngakan Putu. ANALISA SISTEM PENGAMAN GENERATOR PLTDG DI PT INDONESIA POWER UNIT PEMBANGKITAN BALI. Jurnal SPEKTRUM, [S.l.], v. 5, n. 2, p. 145-151, dec. 2018. ISSN 2684-9186. Available at: <https://ojs.unud.ac.id/index.php/spektrum/article/view/44824>. Date accessed: 19 apr. 2024. doi: https://doi.org/10.24843/SPEKTRUM.2018.v05.i02.p18.
Section
Articles

Most read articles by the same author(s)

1 2 3 4 > >>