PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG WISTI SABHA BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI

Main Article Content

Gede Purna Suartawan I. A. Dwi Giriantari I Wayan Sukerayasa Wayan Gede Ariastina I Nyoman Setiawan I Nyoman Satya Kumara

Abstract

The installed PLTS capacity in Bali is currently still 3.44% of the target given by the General National Energy Plan (RUEN) of 108 MWp in 2025. The island of Bali has limited land availability so rooftop PLTS is a solution. The design of the rooftop PLTS was carried out on the roof of the Wisti Sabha Building at I Gusti Ngurah Rai International Airport. The research uses PVSyst simulation software while the investment feasibility method uses the Benefit-Cost Ratio (BCR), Net Present Value and discounted payback period (DPP) methods. Based on the simulation results, the rooftop PLTS capacity is 56.6 kWp with energy production of 98,009 kWh/year. The B-CR value obtained is 2.23, the net present value is IDR 707,436,838.55 and the DPP is 7 years, with a rooftop solar system life of 25 years.

Downloads

Download data is not yet available.

Article Details

How to Cite
PURNA SUARTAWAN, Gede et al. PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG WISTI SABHA BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI. Jurnal SPEKTRUM, [S.l.], v. 11, n. 1, p. 188-196, mar. 2024. ISSN 2684-9186. Available at: <https://ojs.unud.ac.id/index.php/spektrum/article/view/114379>. Date accessed: 19 nov. 2024. doi: https://doi.org/10.24843/SPEKTRUM.2024.v11.i01.p21.
Section
Articles

Most read articles by the same author(s)

<< < 7 8 9 10 11 12