PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG WISTI SABHA BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI

  • Gede Purna Suartawan
  • I. A. Dwi Giriantari
  • I Wayan Sukerayasa
  • Wayan Gede Ariastina
  • I Nyoman Setiawan
  • I Nyoman Satya Kumara

Abstract

The installed PLTS capacity in Bali is currently still 3.44% of the target given by the General National Energy Plan (RUEN) of 108 MWp in 2025. The island of Bali has limited land availability so rooftop PLTS is a solution. The design of the rooftop PLTS was carried out on the roof of the Wisti Sabha Building at I Gusti Ngurah Rai International Airport. The research uses PVSyst simulation software while the investment feasibility method uses the Benefit-Cost Ratio (BCR), Net Present Value and discounted payback period (DPP) methods. Based on the simulation results, the rooftop PLTS capacity is 56.6 kWp with energy production of 98,009 kWh/year. The B-CR value obtained is 2.23, the net present value is IDR 707,436,838.55 and the DPP is 7 years, with a rooftop solar system life of 25 years.

Downloads

Download data is not yet available.
Published
2024-03-31
How to Cite
PURNA SUARTAWAN, Gede et al. PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG WISTI SABHA BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI. Jurnal SPEKTRUM, [S.l.], v. 11, n. 1, p. 188-196, mar. 2024. ISSN 2684-9186. Available at: <https://ojs.unud.ac.id/index.php/spektrum/article/view/114379>. Date accessed: 19 oct. 2025. doi: https://doi.org/10.24843/SPEKTRUM.2024.v11.i01.p21.

Most read articles by the same author(s)

<< < 4 5 6 7 8 9 10 11 12 13 > >>