ANALISA EKONOMI RANCANGAN PLTS OFF-GRID PADA ADIDAYA WORKSHOP

Main Article Content

I.P. Dika Putra Ariantika I.N. Setiawan I.W. Sukerayasa

Abstract

The PLTS Off-Grid design at the Adidaya Workshop as an additional power supplier is based on the load needs used for the equipment and operational on the workshop. PLTS Off-Grid features are economically likely to take a long time to make a profit. This study deals with the economic analysis of the PLTS Off-Grid system design using the Net Present Value (NPV) analysis method and aims to find out the comparison projections between output and output of the Off-Grid PLTS project at the Adidaya Workshop during the estimated life of PLTS will operate over 20 years. After the calculation, it was obtained that 1th Scenario using a variation of the solar panel capacity of 300 Wp with a battery of 540 Ah produced the largest RAB demand value worth Rp. by 286.038.441 While the smallest RAB requirement value is generated from 4th Scenario using a variation in solar panel capacity of 300 Wp with a 540 Ah battery worth Rp 252.093.730. The largest and the smallest NPV values are also generated by 1th and 4th Scenario with the NPV value of -Rp 316.734.509 and –Rp 251.285.665.

Downloads

Download data is not yet available.

Article Details

How to Cite
PUTRA ARIANTIKA, I.P. Dika; SETIAWAN, I.N.; SUKERAYASA, I.W.. ANALISA EKONOMI RANCANGAN PLTS OFF-GRID PADA ADIDAYA WORKSHOP. Jurnal SPEKTRUM, [S.l.], v. 10, n. 3, p. 78-85, sep. 2023. ISSN 2684-9186. Available at: <https://ojs.unud.ac.id/index.php/spektrum/article/view/108183>. Date accessed: 02 july 2024. doi: https://doi.org/10.24843/SPEKTRUM.2023.v10.i03.p9.
Section
Articles

Most read articles by the same author(s)