Solar PV Plant as a Replacement for Power Supply of Irrigation Water Pump

  • I Made Agus Sastradiangga Udayana University
  • Ida Ayu Dwi Giriantari Udayana University
  • I Wayan Sukerayasa Udayana University

Abstract

The southern side of Subak Babakan Yeh Kuning has an agricultural irrigation water shortage due to the dry season’s drought. In 2016, the Ministry of Public Works and Public Housing resolved that by giving diesel-powered irrigation water pump system and groundwater irrigation network, however the high operations cost resulted an abandonment of it. This study conducted a solar power plant design for submersible pumps at the southern side of Subak Babakan Yeh Kuning by calculating the amount of irrigation water needed, designing the solar power plant and the investment costs, and comparing the operations cost between the new and old system. Based on the design, the capacity of the solar power plant was set at 12,54 kWp using 33 solar module units and a 18,5 kW inverter unit. The pump could operate for 5 hours and 30 minutes on a sunny weather with a water discharge of 253 m3 or fulfill 17,5% of water needs  for an area of 16-hectare. The investment costs of the solar power plant pump system were IDR 171.193.500. The operations cost of the new system (solar-powered) per hectare was IDR 6.495/day. Meanwhile, the operations cost of the old system (diesel-powered) per hectare was IDR 15.950/day.

Downloads

Download data is not yet available.

References

[1] Pemerintah Indonesia, Peraturan Presiden Republik Indonesia Nomor 22 Tahun 2017 Tentang Rencana Umum Energi Nasional (RUEN). Indonesia, 2017, pp. 1–227.
[2] I.N.S. Kumara, I. A. D. Giriantari, W. G. Ariastina, W. Sukerayasa, N. Setiawan, C. G. I. Partha, “Peta Jalan Pengembangan PLTS Atap : Menuju Bali Mandiri Energi,” Center For Community Based Renewable Energy (CORE) Universitas Udayana, Greenpeace Indonesia, Bali, 2019.
[3] Kumara, I. N. S., Ariastina, W. G., Sukerayasa, I. W., & Giriantari, I. A. D. (2013, October). “1 MWp grid connected PV systems in the village of Kayubihi Bali; Review on location's characteristics and its technical specifications,” In 2013 International Conference on Information Technology and Electrical Engineering (ICITEE) (pp. 306-311). IEEE.
[4] M. R. Wicaksana, Studi Unjuk Kerja Pembangkit Listrik Tenaga Surya (PLTS) 158 kWp Pada Kantor Gubernur Bali, Universitas Udayana, 2019, unpublished.
[5] K.V. Kumara, I.N.S. Kumara, and W.G. Aristina., “Tinjauan terhadap PLTS 24 kWp atap gedung Pt Indonesia Power Pesanggaran Bali,” J. SPEKTRUM, vol. 5, no. 2, pp. 26-35, Dec. 2018.
[6] N.S Gunawan, I.N.S. Kumara, and R. Irawati, “Unjuk kerja pembangkit listrik tenaga surya (PLTS) 26,4 kWp pada sistem smart microgrid UNUD,” J. SPEKTRUM, vol. 6, no. 3, pp. 1-9, Sep. 2019
[7] I.P.E. Saskara, I.N.S. Kumara, and I.W. Sukerayasa, “Comparison of PV rooftop energy production at Denpasar city office building,” Proceeding ICSGTEIS 2018.
[8] Peraturan Daerah Provinsi Bali Nomor 9 Tahun 2012 Tentang Subak.
[9] Contained Energy Indonesia. Buku Panduan Energi yang Terbarukan. 2011. ISBN 1-885203-29-2
[10] A. T. Ariawan, T. G. I. Partha, and I. W. A. Wijaya, “Perbandingan penggunaan motor DC dengan AC sebagai penggerak pompa air yang disuplai oleh sistem pembangkit listrik tenaga surya (PLTS),” in Prosiding Conference on Smart-Green Technology in Electrical and Information Systems, 2013, no. A-006, pp. 19–24.
[11] I. Amsari, “Analisa unjuk kerja pompa submersible kapasitas 100 l/detik head 18 m putaran 1500 rpm dengan menggunakan metode reliability centered maintenance,” Universitas Sumatera Utara, 2019, unpublished.
[12] Pusdiklat SDA dan Konstruksi, Modul pengetahuan umum irigasi pelatihan operasi dan pemeliharaan irigasi tingkat juru, 3rd ed. Bandung: Kementrian Pekerjaan Umum dan Perumahan Rakyat Badan Pengembangan Sumber Daya Manusia, 2017, pp 49-53.
[13] B. Litbang Pertanian, Pengelolaan tanaman terpadu (PTT) padi sawah irigasi. Jakarta: Kementrian Pertanian Badan Penelitian dan Pengembangan Pertanian, 2013.
[14] R. A. Diantari and I. Pujotomo, “Calculation of electrical energy with solar power plant design,” Int. Semin. Intell. Technol. Its Appl. Calc., pp. 443–446, 2016.
[15] A. Woyte et al., Analytical Monitoring of Grid-connected Photovoltaic Systems, 13 Subtask. Brussels: IEA International Energy Agency, 2014.
[16] O. I. Sanjaya, I. A. D. Giriantari, and I. N. S. Kumara, “Perancangan sistem pompa irigasi pembangkit listrik tenaga surya (PTLS) untuk pertanian Subak Semaagung,” J. SPEKTRUM, vol. 6, no. 3, pp. 114–121, 2019.
[17] G. Arifin Sinaga, I. M. Mataram, and T. G. Indra Partha, “Analisis pembangkit listrik sistem hybrid grid connected di Villa Peruna Saba, Gianyar – Bali,” Universitas Udayana, 2018, unpublished.
[18] D. Kurniawan, “Alasan MTI Jatim Minta Harga Solar Diturunkan,” www.Liputan6.com, 2020. [Online]. Available: https://surabaya.liputan6.com/read/4270844/alasan-mti-jatim-minta-harga-solar-diturunkan. [Accessed: 07-Jun-2020].
Published
2020-12-14
How to Cite
SASTRADIANGGA, I Made Agus; GIRIANTARI, Ida Ayu Dwi; SUKERAYASA, I Wayan. Solar PV Plant as a Replacement for Power Supply of Irrigation Water Pump. International Journal of Engineering and Emerging Technology, [S.l.], v. 5, n. 2, p. 137-143, dec. 2020. ISSN 2579-5988. Available at: <https://ojs.unud.ac.id/index.php/ijeet/article/view/65915>. Date accessed: 25 apr. 2024. doi: https://doi.org/10.24843/IJEET.2020.v05.i02.p23.