Rooftop PLTS is one that is quite promising, but its number in Indonesia is not much. The
Central Government provides a Rooftop PLTS grant to the Bali Provincial Transportation Agency
with an installed capacity of 30 kWp with an On Grid system in order to expand the system capacity.
This study was conducted to determine the potential and savings of the installed PLTS using the
PVsyst program simulation. Based on the results of the study, the results of the simulated PLTS
production were 32,116 kWh, a performance ratio of 78.1%, real PLTS production of 27,133 kWh
and electricity consumption of 39,271 kWh before the installation of the PLTS in 2020 and 33,057
kWh after installation in 2021. The potential savings for 6 months from July to December 2021
amounted to IDR 10,786,359 or 21.50% of the total.

Downloads

Download data is not yet available.

Article Details

How to Cite
RAHMAWATI, Susi; KUMARA, I.N.S; SUYADNYA, I.M.A. ANALISIS UNJUK KERJA PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) ATAP 30 kWp KANTOR DINAS PERHUBUNGAN PROVINSI BALI. Jurnal SPEKTRUM, [S.l.], v. 12, n. 1, p. 51-60, mar. 2025. ISSN 2684-9186. Available at: <https://ojs.unud.ac.id/index.php/spektrum/article/view/126622>. Date accessed: 07 may 2025.