KAJIAN EKONOMI PEMANFAATAN PLTS ATAP DI GEDUNG RUMAH JABATAN GUBERNUR PROVINSI BALI

Main Article Content

Gusti Bagus Diva Aristia Ida Ayu Dwi Giriantari I Wayan Sukerayasa

Abstract

To meet the high demand for electrical energy, an alternative solution that can be applied is the use of New and Renewable EnergyIndonesia targets to achieve Net Zero Emissions (NZE) by 2060. Planning for a rooftop PLTS at the Office of the Governor of the Province of Bali is expected to be able to assist in the expansion of PLTS in the Province of Bali in terms of strengthening Governor Regulations/Regional Regulations that support the use of Solar Power Plants. The design of the rooftop PLTS at the Bali Province Governor's Office Building was carried out using 4 scenarios. Scenario 1 is a design that utilizes the roof area facing the north side. Scenario 2 is by utilizing the roof area only to meet the peak load of the building. Scenario 3 is a design that utilizes the entire roof area of the building that best meets the criteria. Meanwhile, scenario 4 is scenario 2 but uses a microinverter device. The Scenario 2 PLTS design is studied economically because the return on investment is the fastest compared to the other scenario PLTS designs. Based on the economic feasibility analysis of the investment, scenario 2 design has a Net Present Value (NPV) of Rp. 158,771,001, Profitability Index (PI) of 1.32 and a Discounted Payback Period (DPP) of 10.7 years.

Downloads

Download data is not yet available.

Article Details

How to Cite
DIVA ARISTIA, Gusti Bagus; DWI GIRIANTARI, Ida Ayu; SUKERAYASA, I Wayan. KAJIAN EKONOMI PEMANFAATAN PLTS ATAP DI GEDUNG RUMAH JABATAN GUBERNUR PROVINSI BALI. Jurnal SPEKTRUM, [S.l.], v. 10, n. 4, p. 281-287, dec. 2023. ISSN 2684-9186. Available at: <https://ojs.unud.ac.id/index.php/spektrum/article/view/111624>. Date accessed: 19 may 2024. doi: https://doi.org/10.24843/SPEKTRUM.2023.v10.i04.p33.
Section
Articles

Most read articles by the same author(s)

1 2 3 4 5 6 > >>