POTENSI PENGHEMATAN BIAYA TAGIHAN LISTRIK PASCA PEMASANGAN PLTS ATAP GEDUNG RUSUNAWA UNIVERSITAS UDAYANA

Main Article Content

I Wayan Dicky Widiandika Putra Wayan Gede Ariastina Ida Ayu Dwi Giriantari I Nyoman Setiawan I Wayan Sukerayasa I Nyoman Satya Kumara

Abstract

The limited availability of natural resources and the impact on the environment that regularly using fossil-based electricity become the basis for the government to develop renewable energy. One of the potential uses of renewable energy in Indonesia is a rooftop solar power plant which in its design does not require a large area of land and space for the placement of solar modules. This research designing rooftop solar power plants with an on-grid system on the Udayana University Rusunawa building with the capacity scenario of 20 kWp, 15 kWp, and 10 kWp using HelioScope. Based on the results of rooftop solar power plants production can be seen the potential cost savings of electricity bills each year. Based on the results of the design for rooftop solar power plants scenario, the number of solar modules obtained is 40 pieces, 30 pieces and 20 pieces with potential savings in electricity bill costs of Rp. 33.391.515, Rp. 28.933.478 and Rp. 23.269.285 per year.

Downloads

Download data is not yet available.

Article Details

How to Cite
WIDIANDIKA PUTRA, I Wayan Dicky et al. POTENSI PENGHEMATAN BIAYA TAGIHAN LISTRIK PASCA PEMASANGAN PLTS ATAP GEDUNG RUSUNAWA UNIVERSITAS UDAYANA. Jurnal SPEKTRUM, [S.l.], v. 10, n. 4, p. 91-97, dec. 2023. ISSN 2684-9186. Available at: <https://ojs.unud.ac.id/index.php/spektrum/article/view/111575>. Date accessed: 19 nov. 2024. doi: https://doi.org/10.24843/SPEKTRUM.2023.v10.i04.p12.
Section
Articles

Most read articles by the same author(s)

<< < 6 7 8 9 10 11 12 > >>