Analisis Percepatan Pelaksanaan Pekerjaan pada Proyek Pembangunan Safety Riding Centre

  • Dorlan Siregar Universitas Medan Area Medan, Sumatera Utara, Indonesia

Abstract

The Accelerating project completion must be done with proper planning. One of the alternatives that can be used to support the acceleration of work activities is by adding manpower and working hours, in order to address delays in a project. To achieve maximum benefits without compromising workplace safety and job quality. The aim of this research is to analyze the acceleration of the implementation of the safety riding center project by adding optimal manpower and working hours. The method used in this research is a descriptive method with a case study approach. The Crashing method is used to expedite the delay in the riding center project using Microsoft Office Project 2016 as a data processing tool. After analyzing the data, it can be concluded that there are 3 critical paths that affect the implementation of the safety riding center project, and adding optimal manpower and working hours is performed. The results obtained after the analysis show that the upper structure work has the longest critical path with an initial completion time of 161 days, which is accelerated by 38 days to become 123 days earlier with the addition of 8 workers. With an initial cost of 4,519,890,373 becoming 4,519,965,373. The higher the cost incurred, the faster the delayed work is completed.

Downloads

Download data is not yet available.

References

Astria, Ivana. 2018. Analisis Perbandingan percepatan pelaksanaan Pekerjaan Ditinjau Dari Penambahan Tenaga Kerja Dengan Penambahan Jam Kerja Pada Proyek Pembangunan Gedung ITERA Tahap I. Bandar lampung : Universitas Lampung.

Budiono, 2018. Simulasi Waktu Dan Biaya Pada Konstruksi PIER Pada Jalan Layang Suprapto Jakarta. Jakarta : Universitas Indonesia.

Ervianto, Wulfram I. 2017. Manajemen Proyek Konstruksi. Andi : Yogyakarta.

Hernandi, Y., & Tamtana, J. S. (2020). Faktor-Faktor Yang Mempengaruhi Produktivitas Pekerja Pada Pelaksanaan Konstruksi Gedung Bertingkat. JMTS: Jurnal Mitra Teknik Sipil, 3(2), 299.

Mandani, Toma. 2020. Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Pasangan Bata. Skripsi, Surakarta: Universitas Sebelas Maret.

Priyo, M. & Paridi, M. R. A. (2018). Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi Pembangunan Gedung Olahraga (GOR). Semesta Teknika, 21(1), 72-84.

Pramuji. 2018. Pengukuran produktivitas pekerja sebagai dasar perhitungan upah kerja pada anggaran biaya. Skripsi, Medan : Universitas Sumatra Utara.

Sarniah, Cahyadi, H., & Dkk. (2019). Analisis Yang Mempengaruhi Produktivitas Pekerja Batu Pada Proyek Rehabilitasi Daerah irigasi Rawa Belanti I Dan II Kabupaten Tapin. Concept and Communication, null(23), 301–316.

Setiawan, L. & Tamtana, J. S. (2020). Analisis Percepatan Durasi Pekerjaan Basement Semi Top Down dengan Metode Time Cost Trade Off. Jurnal Mitra Teknik Sipil, 3(1), 143-154.

Soeharto, I., 2019. Manajemen Proyek dari Konseptual Sampai Operasional, Erlangga, Jakarta.

Sudarsana, D.K., 2020. Pengendalian Biaya Dan Jadual Terpadu Pada Proyek Konstruksi, Jurnal Ilmiah, Universitas Udayana.

Wijaya, G. A., Sucita, I. K., & Saputra, J. (2021). Analisis Tingkat dan Faktor

Produktivitas Tenaga Kerja pada Pekerjaan Struktur Atas di Proyek X. Portal: Jurnal Teknik Sipil, 13(2), 56–63
Published
2024-09-01
How to Cite
SIREGAR, Dorlan. Analisis Percepatan Pelaksanaan Pekerjaan pada Proyek Pembangunan Safety Riding Centre. Pustaka : Jurnal Ilmu-Ilmu Budaya, [S.l.], v. 24, n. 2, p. 134-137, sep. 2024. ISSN 2528-7516. Available at: <https://ojs.unud.ac.id/index.php/pustaka/article/view/114016>. Date accessed: 22 nov. 2024. doi: https://doi.org/10.24843/PJIIB.2024.v24.i02.p03.
Section
Articles