Analisis Performansi dan Ekonomi PLTS Atap 10 kWp pada Bangunan Rumah Tangga di Desa Batuan Gianyar
Abstract
The Efforts to accelerate the development of renewable energy power plants continue to be driven by the central government as stipulated in the National Energy General Plan. One of the plants developed is the Solar Power Plant. Currently about Solar Power Plant in Indonesia is built to reach 152.44 MW from the target set at 6.5 GW. The central government through the Minister of Energy of Resources and Minerals issued policy No. 49 of 2018 on the use of rooftop power plants. Gianyar is one of the areas that have good solar irradiation with an average of 4.99 kWh/m2/day, where it is very potential to build a rooftop PV. This research aims to find out the study of electrical energy and ecomonic generated from Solar Power Plant 10 kWp in Batuan village. Furthermore, surveyed the field to collect data to simulate the performance, comparison, and investment feasibility of the construction of the Solar Power Plant. Data collection of real production and real consumption is carried out for 12 months. Simulations use PVsyst programs and investment feasibility using several methods, such as Net Present Value.(NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), Profitability Index (PI), and Payback Period (PP). The total potential Solar Power Plant in of Batuan Village household is 9.3 kWp from the entire roof of the installation of 78.11 m2. The construction of Solar Power Plant in households in Batuan Village with a capacity of 10 kWp has a potential of 6336.3 kWh in a year with a performance of 30.9%, while in real production this Solar Power Plant is able to produce a total of 8,502 kWh in a year. In economic analysis, the feasibility level of plts development investment was declared unfit, with an NPV value of Rp. - 321,004,050 at a discount rate of 10%, the value of IRR - 90.4%, BCR worth 0.78, PI at 0.32, and PP which reached 78 years.
Downloads
References
[2] “Peta Jalan Pengembangan PLTS Atap Menuju Bali Mandiri Energi”. Laporan CORE. 2019
(https://www.greenpeace.org/indonesia/publikasi/3876/peta-jalan-pengembangan-plts-atap-menuju-bali-mandiri-energi/ diakses 15 Maret 2020)
[3] I.K.A. Setiawan, I.N.S. Kumara, I.W. Sukerayasa, “Analisis Unjuk Kerja Pembangkit Listrik Tenaga Surya (Plts) Satu Mwp Terinterkoneksi Jaringan Di Kayubihi Bangli”, Majalah Ilmiah Teknik Elektro, Vol. 13, No.1, 2014.
[4] I.N.S Kumara, W.G. Ariastina, I.W. Sukerayasa, I.A.D. Giriantari. “1 MWp Grid Connected PV Systems in the Village of Kayubihi Bali”, 6th Conferences Information Technology and Electrical Engineering (ICITEE), 2014
[5] PT. PLN. (Persero), Rencana Usaha Penyediaan Tenaga Listrik, Jakarta: PT PLN (Persero) 2017-2026, 2017.
[6] I. D. G. Y. P. Pratama, I. N. S. Kumara and I. N. Setiawan, "Potensi Pemanfaatan Atap Gedung Pusat Pemerintahan Kabupaten Badung Untuk PLTS Rooftop", E-Journal SPEKTRUM, Vol. 5, No. 2, pp. 119- 128, 2018.
[7] I.M.A Nugraha, P.A. Ridhana, K. Listuayu. “Analisis Produksi Dari Inverter Pada Grid–Connected PLTS 1 MWp di Desa Kayubihi Kabupaten Bangli”, Majalah Ilmiah Teknik Elektro, Vol 17 , No. 1 , Januari –April, 2018.
[8] BPS Kabupaten Gianyar. “Kabupaten Badung Dalam Angka 2019”. Gianyar: BPS Kabupaten Gianyar. 2019.
[9] Permen ESDM RI No.49. Penggunaan sistem pembangkit listrik Tenaga surya atap oleh konsumen PT Perusahaan Listrik Negara (Persero), Nopember (2018).
[10] Syahputra, Rhezi. “Perencanaan Pembangkit Listrik Tenaga Surya Sistem Stand Alone Kapasitas 900 Watt Peak untuk Rumah Tinggal di Purwokerto”. Universitas Jendral Soedirman. Purwokerto, 2013.
[11] Shahinzadeh, Hossein. “Technical and Economic Study for Use The Photovoltaic System for Electricity Supply in Isfahan Museum Park”. Inernational Journal of Scientific and Technology Research. Volume 2. ISSUE 1, 2013.
[12] Jufrizel dan Muhammad Irfan. “Perencanaan Teknis dan Ekonomis Pembangkit Listrik Tenaga Surya Sistem On-Grid”. Seminar Nasional Teknologi Informasi, Komunikasi dan Industri (SNTIKI) 9. Fakultas Sains dan Teknologi, UIN Sultan Syarif Kasim Riau, 8-19 Mei 2017.
[13] Nugraha, I Made Aditya et al. Perancangan Hybrid System PLTS dan Generator Sebagai Catu Daya Tambahan Pada Tambak Udang Vaname: Studi Kasus Politeknik Keluatan Dan Perikanan Kupang. Majalah Ilmiah Teknologi Elektro, [S.l.], v. 19, n. 1, p. 121-125, oct. 2020. ISSN 2503-2372.
[14] Tan, D., & Seng, A. K. (2014). Handbook for Solar Photovoltaic Systems. Singapore: Energy Market Authority.
[15] K. Yonata. 2017. “Analisis Tekno-Ekonomi Terhadap Desain Sistem PLTS Pada Bangunan Komersial Di Surabaya, Indonesia”. Skripsi. Teknik, Teknik Elektro, ITS, Surabaya.
[16] G. Pradika, I.A.D. Giriantari, I.N. Setiawan. “Potensi Pemanfaatan Atap Tribun Stadion Kapten I Wayan Dipta Gianyar sebagai PLTS Rooftop”. Majalah Ilmiah Teknologi Elektro, Vol. 19, No. 2, Juli - Desember 2020
[17] Ross, S. (2010). “Fundamental of Corporate Finance”. McGraw Hill.
[18] Kashmir & Jakfar, “Studi Kelayakan Bisnis” Edisi Revisi, Penerbit PT. Desindo Putra Mandiri, Jakarta. 2017.
[19] Pangaribuan, B. M., Ayu, I., Giriantari, D., & Sukerayasa, I. W. (2020). Desain PLTS Atap Kampus Universitas Udayana: Gedung Rektorat. Jurnal SPEKTRUM Vol, 7(2).
[20] Winardi, B., Nugroho, A., & Dolphina, E. (2019). Perencanaan dan Analisis Ekonomi Pembangkit Listrik Tenaga Surya (PLTS) Terpusat untuk Desa Mandiri. Jurnal Tekno, 16(2), 1-11.
[21] Hidayat, F., Winardi, B., & Nugroho, A. (2019). Analisis Ekonomi Perencanaan Pembangkit Listrik Tenaga Surya (Plts) Di Departemen Teknik Elektro Universitas Diponegoro. Transient: Jurnal Ilmiah Teknik Elektro, 7(4), 875-882.
[22] Suripto, H., & Fathoni, A. (2021). Analisis Kelayakan Pembangkit Listrik Tenaga Surya; sebuah review berdasarkan data histori, metode analisis, dan nilai ekonomi. Jurnal Aptek, 13(1), 33-41.
[23] Ramadhan, M. D. C. (2021). Perancangan Pembangkit Listrik Tenaga Surya (PLTS) pada Kolam Budidaya di Daerah Sentono Menggunakan Software Pvsyst. JUPITER (JURNAL PENDIDIKAN TEKNIK ELEKTRO), 6(2), 18-30.
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
This work is licensed under a Creative Commons Attribution 4.0 International License