Abstract

Abstract— Most of the power plants use fossil energy sources, while fossil energy has several undesirable effects. To overcome this, it is necessary to develop in electricity that is by using renewable energy as a source of electrical energy. Some examples of electrical renewable energy sources used are solar energy and wind energy. Renewable energy as electricity generation can be developed using a microgrid concept, generation with more than one power plant. The combination of different types of power plants is often called a hybrid power plant. One example is a hybrid power plant with a smart microgrid network system at the Department of Electrical Engineering, Faculty of Engineering, Udayana University, which has been operating since 2017, which is a collaboration between Udayana University and the Ministry of Energy and Mineral Resources (ESDM). This smart microgrid requires a study of the energy supply system of the power generation in order to know its performance to serve the DH building load. The study will analyze the data in October 2018. Research results show that smart microgrids cannot fully meet the electricity load in October 2018. The electrical energy load of 4330 kWh DH building is supplied by PLTS 333,383 kWh, PLTB 121.07 kWh, and supply of 803.57 batteries. kWh The shortage of electrical energy from the microgrid system is supplied by PLN by 1591.7 kWh and when overproduction, PLN can get energy from the 541 kWh microgrid. Battery charging energy is 1894.38 kWh. The use of renewable energy in the DH building reached 63.24%. 


Keywords— Microgrid, PLTS, PLTB, Battery

Downloads

Download data is not yet available.

References

[1] PT.PLN (PERSERO). 2019. RUPTL (Rencana Usaha Penyediaan Tenaga Listrik). Jakarta : Kementerian Energi dan Sumber Daya Mineral
[2] I.N.S. Kumara, W.G. Ariastina, I.W. Sukerayasa, I.A.D. Giriantari. 2014. On The Potential And Progress Of Renewable Electricity Generation in Bali. Yogyakarta. ICITEE 2014
[3] Pemerintah RI. 2017. Peraturan Presiden Nomor 22 Tahun 2017 Tentang Rancangan Umum Energi Nasional
[4] Giriantari I.A.D, Irawati. R. 2016. Smart Microgrid System with Hybrid System Supply: Udayana University Pilot Project Design. ICSGTEIS 2016
[5] Margareta Yuniari, I.A.D Giriantari, I.W. Sukerayasa. 2017. Analisa Model Supply Pada Jaringan Sistem Kelistrikan di Fakultas Teknik Universitas Udayana Bukit Jimbaran. Jurnal Teknik Elektro. Vol 16 No 03
[6] Trisnasari C.T. 2016. Pemodelan dan Simulasi Sistem Proteksi Microgrid. Jurnal Teknik ITS. Vol 5 No 2.48-52.
[7] Nyserda. http://www.Nyserda.ny.gov/All-program/Program/NY-Prize/Resorce-for applicants/Microgrid-101. [Online]. Diakses pada Oktober 2018
[8] N. Wicaksono, R.S. Wibowo, H. Suryoatmojo. 2016. Economic dispath untuk Sistem Kelistrikan Microgrid dengan Energy Storage berbasis Adaptive Particle Swarm Optimization. Jurnal Teknik ITS. Vol 5 No 2
[9] S Manalu, C.O.P. Marpaung.2019. Techno Economic Analysis of a Microgrid System to Increase Electricity Acces in Rural Areas. IJSGSET Transsactions on Smart Grid and Sustainable Energy. Vol 3 No 2
[10] H.Kristiawan, I.N.S Kumara, I.A.D Giriantari. 2019. Potensi Pembangkit Listrik Tenaga Surya Atap Gedung Sekolah di Kota Denpasar. Jurnal Spektrum. Vol 6 No 2
[11] K.V. Kumara, I.N.S. Kumara, W.G. Ariastina. 2018. Tinjauan Terhadap PLTS 24 kW Atap Gedung PT Indonesia Power Pesanggaran Bali. E-Journal Spektrum. Vol 5 No 2
[12] M.R. Wicaksan, I.N.S. Kumara, I.A.D.Giriantari, R. Irawati. 2019. Unjuk Kerja Pembangkit Listrik Tenaga Surya Rooftop 158 kWp Pada Kantor Gubernur Bali. Jurnal Spektrum. Vol 6 No 3
[13] N.S. Gunawan, I.N.S. Kumara, R.Irawati. 2019. Unjuk Kerja Pembangkit Listrik Tenaga Surya (PLTS) 26,2 kWp Pada Sistem Smart Microgrid Unud. Jurnal Spektrum. Vol 6 No 3
[14] I.A. Medina, I A D Giriantari, I. W Sukerayasa. 2018. Kajian dan Evaluasi Sistem Suplai Energi Listrik PLTS dan PLTB di Kampus Teknik Elektro Universitas Udayana Bukit Jimbaran Bali. Majalah Ilmiah Teknologi Elektro. Vol.17,No.3.
Published
2020-10-15
How to Cite
ARSIKAPUTRA, I Putu; GIRIANTARI, I.A.D.; ARIASTINA, W.G.. Studi Unjuk Kerja Smart Microgrid Sistem Hibrid di Jurusan Teknik Elektro Universitas Udayana Kampus Bukit Jimbaran. Majalah Ilmiah Teknologi Elektro, [S.l.], v. 19, n. 1, p. 89-94, oct. 2020. ISSN 2503-2372. Available at: <https://ojs.unud.ac.id/index.php/mite/article/view/58171>. Date accessed: 03 dec. 2024. doi: https://doi.org/10.24843/MITE.2020.v19i01.P13.