Revitalisai PLTS Off-Grid 15 kWp Desa Datah Sebagai Catu Daya Pompa Air Pedesaan

  • I.G.A.D. Sasmita Universitas Udayana
  • I.G.A.D. Giriantari Universitas Udayana
  • I Nyoman Satya Kumara Universitas Udayana

Abstract

At present all aspects of electricity are carried out by PT. PLN (Persero) throughout Indonesia. There are still many villages in Indonesia that are dark or not yet electrified. It is recorded that up to now 2,500 villages have not yet been connected to electricity. The Ministry of Energy and Mineral Resources (ESDM) has now sought a solution so that 2,500 villages can enjoy electricity. One of them is by using renewable energy. One of them is PLTS Datah, the asset is not functioning anymore and in some parts there is damage. Asah Teben Hamlet, Datah Village has an area of ??6.74 km2 which has a fairly high population with a population of 315 family heads in 2018. With such density, the water needs of each person are more than 150 liters per day per person. With the energy generated at 10 kWp, it is expected that later the need for clean water in residential areas of around 315 families can be fulfilled. With the existing water source, it can meet the water needs of residents in Asah Teben Datah Hamlet. From the calculation results, the water price is Rp. 1,288 is cheaper than the PDAM water price of Rp. 1,500. The price of water is quite cheap and can be reached by residents.


Keywords— Renewable Energy, Off-grid PV, Water Pumps, Solar Pumping, Water Distribution

Downloads

Download data is not yet available.

References

[1] Nusa. 2018. “Proyek PLTS Mangkrak”. Nusa Bali, 29 Juli 2016. https://www.nusabali.com/berita/6477/proyek-plts-mangkrak.
[2] Sularso.(2004).Pompa dan Kompresor, Jakarta :Pradnya Paramita.
[3] Pemkab. 2011. http://karangasemkab.go.id/
[4] I.B.K. Sugirianta, I.A.D. Giriantari, I.N.S. Kumara. 2016. ”Analisa Keekonomian Tarif Listrik Pembangkit Listrik Tenaga Surya 1 MWP Bangli Dengan Metode Life Cycle Cost” Jurnal Teknologi Elektro, Vol. 15, No.2, Juli-Desember 2016.
[5] Kadir,A. 2010. Energi: Sumber Daya, Inovasi, Tenaga Listrik dan Potensi Ekonomi, edisi 3. Jakarta: Universitas Indonesia.
[6] E.T.A.Duka, I.N. Setiawan, A.I. Weking. 2018.”Perencanaan Pembangkit Listrik Tenaga Surya Hybrid Pada Area Parkir Gedung Dinas Cipta Karya Dinas Bina Marga dan Pengairan Kabupaten Badung” E-Journal Spektrum Vol. 5, No. 2 Desember 2018.
[7] P.A.R. Arimbawa, I.N.S. Kumara, R.S. Hartati. 2016.”Studi Pemanfaatan Catu Daya Hibrida PLTS 3,7 KWP dan PLN Pada Instalasi Pengelolaan Air Limbah Desa Pemecutan Kaja Denpasar Bali” Jurnal Teknologi Elektro, Vol. 15, No.2, Juli-Desember 2016.
[8] Titra. 2019. “Proyeksi Laju pertumbuhan Penduduk Di Indonesia Tahun 2019”[Tugas Akhir]. Medan : Universitas Sumatera Utara.
[9] Deny T. 2016 ”Perencanaan Instalasi Pengolahan Air Minum Di Kecamatan Jatinangor Dan Kecamatan Cimanggung Kabupaten Sumedang” [Skripsi]. Bandung (ID): Fakultas Teknik Universitas Pasundan.
[10] A.K. Neno, H. Harijanto, A. Wahid. 2016.“Hubungan Debit Air Dan Tinggi Muka Air Di Sungai Lambagu Kecamatan Tawaeli Kota Palu” Jurnal Warta Rimba, Vol. 4 No.2 Hal: 1-8 Desember 2016.
[11] Z.Iqtimal, I.D. Sara, Syahrizal. 2018.”Aplikasi Sistem Tenaga Surya Sebagai Sumber Tenaga Listrik Pompa Air” Jurnal Online Teknik Elektro, Vol. 3 No.1 2018: 1-8.
[12] K.L. Yana, K.R. Dantes, N.A. Wigraha. 2017. “Rancang Bangun Mesin Pompa Air Dengan Sistem Recharging” Jurnal Jurusan Pendidikan Teknik Mesin (JJPTM) Vol: 8 No: 2 2017.
[13] Yanti Nurhotijah, Monang Situmorang, Asep Alipudin. 2017. “Analisi Perhitungan Harga Pokok Produksi Air Sebagai Dasar Penetapan Harga Jual Pada PDAM Tirta Jaya Mandiri Kabupaten Sukabumi Periode 2015-2016”Julnal Online Mahasiswa (JOM) Bidang Akuntansi Vol 2 No.2.
Published
2019-12-25
How to Cite
SASMITA, I.G.A.D.; GIRIANTARI, I.G.A.D.; KUMARA, I Nyoman Satya. Revitalisai PLTS Off-Grid 15 kWp Desa Datah Sebagai Catu Daya Pompa Air Pedesaan. Majalah Ilmiah Teknologi Elektro, [S.l.], v. 18, n. 3, p. 347-352, dec. 2019. ISSN 2503-2372. Available at: <https://ojs.unud.ac.id/index.php/mite/article/view/52006>. Date accessed: 19 nov. 2024. doi: https://doi.org/10.24843/MITE.2019.v18i03.P07.