Studi Analisis Dampak Pemasangan Over Load Shedding Terhadap Pembebanan Pada Saluran Transmisi 150KV di Bali
Abstract
Safety system supply of electrical power to the transmission system is very important, to maintain the continuity of the load flow of electrical power. PT PLN (Persero) has continued to develop a security system, one with Over Load Shedding or OLS. Over Load Shedding is a form of action over load shedding that occurs automatically or manually installed on the transmission line as security in order to avoid or prevent the
occurrence of total outages. This thesis is a case study occurred Cable Channels Over Load on Sea in Bali (January 2015), which reached 432MW from 340MW capacity may be burdened besides GI Gilimanuk and GI Pesanggaran Trip 125.4MW so OLS stage 1 and stage 2 works by removing loads of 89.76MW. Load flow analysis results simulated using ETAP software Powerstation when OLS stage 1 work, the load flow into 359.532MW Submarine Cable Channels and when OLS stage 2 work, the load flow Submarine Cable Channels be 339.664MW, OLS worked for 9 seconds until the flow of electrical power loss can kontiyuitas met and the loadflow on the 150 kV transmission system in Bali is maintained.
Downloads
References
[2] PLN (Persero), PT. 2015. Logsheet APB Bali Bulan Nopember 2015 : PT. PLN (Persero) Region Bali.
[3] Subakat, A. 2014. “Studi Pengaruh Pemasangan Load Shedding di Gardu Induk Pemecutan Kelod dan Gardu Induk Nusa Dua”. (tugas akhir). Jimbaran : Jurusan Teknik Elektro Universitas Udayana.
[4] Parahon. R. 2013. “Penerapan Relay Over Load Shedding pada Trafo TD 3 #30MVA GI Sukamerindu Bengkulu Dengan Setting Arus Primier 70kV Untuk Mentripkan Penyulang 20kV’.
(tugas akhir). Semarang : Jurusan Teknik Elektro Universitas
Diponegoro.
[5] Setiawan, N. Studi Aliran Daya Jaringan Distribusi 20kV di Bali
Dengan Metode Yang Lebih Cepat. Majalah Ilmiah Teknologi ElektroVol.6 No.1 Januari-Juni 2007
[6] Weking, A.I. Pengembangan Analisis Aliran Daya Dengan
Memperhitungkan Pengaruh Kualitas Energi Listrik. Majalah Ilmiah Teknologi Elektro Vol.8 No.1 Januari-Juni 2009
[7] Mardiana, A. 2016. “Rancang Bangun Penyeimbang Arus Beban Pada Sistem 3 Fasa Menggunakan Mikrokontroler AT Mega 2560”. (tugas akhir). Jimbaran : Jurusan Teknik Elektro Universitas Udayana.
[8] Arismunandar, A. 2004. Teknik Tenaga Listrik (Jilid II).
Jakarta : PT Pradnya Paramita.
[9] PLN (Persero), PT. 2015. Statistik PLN 2015 : PT PLN (Persero) P3BJB Region Jawa Timur dan Bali.
Keywords
This work is licensed under a Creative Commons Attribution 4.0 International License