STUDI RUGI DAYA SISTEM KELISTRIKAN BALI AKIBAT PERUBAHAN KAPASITAS PEMBANGKITAN DI PESANGGARAN
Abstract
In the years of 2014 until 2015 Pesangaran plant
capacity undergo changes due to the expiration of
employment contract lease diesel units and also the addition
of new plant unit of 200 MW PLTMG. An increase or
reduction in plant capacity of electrical system Bali will lead
to significant changes to the load flow, power losses and
energy losses in the circuit of Bali electrical Transmission
system. Load flow analysis and power losses in Bali
electricity system is simulated in five scenarios. Scenario 1 for
the conditions of existing in 2014, scenario 2 is currently
experiencing a reduction Pesanggaran plant capacity in
December 2014, scenario 3 is currently experiencing
Pesanggaran plant capacity additions in 2015 by using a peak
load of 2014, scenario 4 is the scenario 3 with using predicted
peak load in 2015, and scenario 5 is the scenario 4 with
assuming the Celukan Bawang plant operates at 130 MW.
Based on the results obtained by analysis, scenario 2 has the
most power and energy loss about 46.34 MW and 300.39
GWh. For the loss of power and energy Bali electrical systems
after Pesanggaran plants changes in 2015 are 38.57 MW and
250.05 GWh.