ASTANA, I Nyoman Yudha.
PERENCANAAN WAKTU PELAKSANAAN PROYEK DENGAN MEMPERTIMBANGKAN METODE PEMBAYARAN (STUDI KASUS: PROYEK HOTEL CITADINES BERAWA BEACH, BADUNG, BALI).
Jurnal Ilmiah Teknik Sipil, [S.l.], v. 26, n. 2, p. 156-164, july 2022.
ISSN 2541-5484.
Tersedia pada: <https://ojs.unud.ac.id/index.php/jits/article/view/91299>. Tanggal Akses: 15 oct. 2025
doi: https://doi.org/10.24843/JITS.2022.v26.i02.p10.