JONI, I Gede Putu; DEWI, Anak Agung Diah Parami; SASMITA, I Gede Abdi Candra. ANALISIS PERBANDINGAN WAKTU DAN BIAYA PELAKSANAAN PEKERJAAN ANTARA PLAT LANTAI BONDEK DENGAN KONVENSIONAL (STUDI KASUS : PROYEK PEMBANGUNAN RSU GARBAMED-KEROBOKAN). Jurnal Ilmiah Teknik Sipil, [S.l.], p. 63-70, jan. 2020. ISSN 2541-5484. Available at: <https://ojs.unud.ac.id/index.php/jits/article/view/58692>. Date accessed: 08 may 2024. doi: https://doi.org/10.24843/JITS.2020.v24.i01.p08.