Agung Yana, A.
(2012).
PENGARUH JAM KERJA LEMBUR TERHADAP BIAYA PERCEPATAN PROYEK DENGAN TIME COST TRADE OFF ANALYSIS (STUDI KASUS: PROYEK REHABILITASI RUANG PERTEMUAN DINAS PERTANIAN TANAMAN PANGAN PROVINSI BALI).
Jurnal Ilmiah Teknik Sipil, .
Retrieved from https://ojs.unud.ac.id/index.php/jits/article/view/3437