Krisnawan, M., Warsika, I., & -, M.
(2015).
ANALISIS KEBUTUHAN MODAL KERJA PADA PEMBANGUNAN PROYEK PERUMAHAN DENGAN METODE DISCOUNTED CASH FLOW (Studi Kasus: Proyek Perumahan Green Imperial Putra Residence).
Jurnal Ilmiah Teknik Sipil, .
Retrieved from https://ojs.unud.ac.id/index.php/jits/article/view/24182