Implementation of User Acceptance Tests in Capstone Project Information Systems

Case Studies from Electrical Engineering Study Program of Udayana University

  • Made Wiradarma Universitas Udayana
  • Putu Gede Pradana Adnyana Universitas Udayana
  • Ngurah Indra ER Universitas Udayana
  • Fajar Purnama Universitas Udayana
  • Adi Panca Saputra Iskandar Universitas Udayana
  • Gede Sukadarmika Universitas Udayana

Abstract

The Capstone Project Information System (SICP) was developed to manage the administration of capstone projects in the Electrical Engineering Study Program at Udayana University, aiming to minimize repetitive tasks and reduce the potential for human error. Testing was conducted using the User Acceptance Testing (UAT) method to ensure the system meets the needs and expectations of end users. UAT involved various user roles and utilized the Likert scale for evaluation. The test results indicate that the system operates according to functional specifications, and users are satisfied with the interface and functionality. The overall UAT score of 0.939 shows that SICP has successfully met user needs very well. This testing ensures that SICP is ready for use and contributes to the accreditation achievement from the Indonesia Accreditation Board for Engineering Education (IABEE).

Downloads

Download data is not yet available.

References

[1] IABEE, “Mengapa Perlu Akreditasi IABEE « IABEE – Indonesian Accreditation Board for Engineering Education.” Accessed: Nov. 19, 2023. [Online]. Available: https://iabee.or.id/akreditasi/mengapa-perlu-akreditasi-iabee/
[2] P. Leloudas, Introduction to Software Testing. 2023. doi: 10.1007/978-1-4842-9514-4.
[3] M. A. Chamida, A. Susanto, and A. Latubessy, “Analisa User Acceptance Testing Terhadap Sistem Informasi Pengelolaan Bedah Rumah Di Dinas Perumahan Rakyat Dan Kawasan Permukiman Kabupaten Jepara,” Indones. J. Technol. Informatics Sci., vol. 3, no. 1, pp. 36–41, 2021, doi: 10.24176/ijtis.v3i1.7531.
[4] A. R. Yusmita, H. Anra, and H. Novriando, “Sistem Informasi Pelatihan pada Kantor Unit Pelaksana Teknis Latihan Kerja Industri (UPT LKI) Provinsi Kalimantan Barat,” J. Sist. dan Teknol. Inf., vol. 8, no. 2, p. 160, 2020, doi: 10.26418/justin.v8i2.36797.
Published
2025-01-02
How to Cite
WIRADARMA, Made et al. Implementation of User Acceptance Tests in Capstone Project Information Systems. Journal of Electrical, Electronics and Informatics, [S.l.], v. 8, n. 2, p. 26-31, jan. 2025. ISSN 2622-0393. Available at: <https://ojs.unud.ac.id/index.php/jeei/article/view/118428>. Date accessed: 07 jan. 2025.

Most read articles by the same author(s)

1 2 > >>