Rancang Bangun Prototype Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Dengan Studi Kasus Saluran Irigasi Di Desa Medewi Kecamatan Pekutatan Kabupaten Jembrana
PLTMH
Abstract
Micro Hydro Power (MHP) is a small power plant that uses water to generate electricity. It can be found in irrigation canals, rivers, or waterfalls. The amount of water and head height are important factors in determining the power output. The irrigation canal in Medewi Village is being used as a research location for MHP. Researchers will use the data to perform calculations and design a prototype. They will also conduct an economic analysis of the MHP to determine its feasibility. The discharge at the research location is 0.23 m3/s, and the waterfall is 2.24 m high. Through the calculation results, the researchers determined that the turbine is a crossflow turbine. The turbine power is 3.9 kW, the generator power is 4.375 kVA, and the turbine power in the homer software is 4.195 kW. The cost of building the MHP in the irrigation canals in Medewi Village is IDR15.774.952. With a 6% discount rate, the BCR is 4,81, the NPV value is IDR75.952.768, the IRR is 107%, and the BEP result per unit The payback period is six months and five weeks. Selling 101925,571 kWh results in an LCC of IDR37.719.896. Using MHP throughout its economic life results in a cost that is less than the price paid to PLN.
Downloads
References
[2] Azharul, F., Dharmanto, A., & Wilarso. (2020). Perhitungan Turbin Air Mikrohidro Tipe Cross-flow Kapasitas 2.500 Watt.
[3] Putra, I. W., Weking, A. I., & Jasa, L. (2018). Analisa Pengaruh Tekanan Air Terhadap Kinerja PLTMH dengan Menggunakan Turbin Archimedes Screw. Majalah Ilmiah Teknologi Elektro, 385-392.
[4] Wiranata, I. A., Janardana, I. N., & Wijaya, I. A. (2020). Rancang Bangun Prototype Pembangkit Listrik Tenaga Mikro Hidro Menggunakan Turbin Cross-Flow. Jurnal Spektrum, 7(4), 151-160.
[5] Murni, S. S., & Suryanto, A. (2020). Analisis Efisiensi Daya Pembangkit Listrik Tenaga Mikrohidro Menggunakan Homer (Studi Kasus Parakandowo Kabupaten Pekalongan). Jurnal Listrik, Instrumensasi dan Elektronika Terapan, 1(2), 34-38.
[6] Utama, H. S., & Kusriyanto, M. (2018). Prototype Pembangkit Mikrohidro Terintegrasi Beban Komplemen. Teknoin, 24(1), 55-56.
[7] Sukamta, S., & Kusmantoro, A. (2013). Perencanaan Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Jantur Tabalas Kalimantan Timur. Jurnal Teknik Elektro, 5(2), 58-63.
[8] Virgunia, D. A., Sukerayasa, I. W., Ariastina, W. G., Setiawan, I. N., Giriantari, I. A., & Satya Kumara, I. N. (2024). Perancangan PLTMH Sungai Yeh Ha di Karangasem dengan Turbin Crossflow. Jurnal SPEKTRUM, 256-268.
[9] Swasty, Renatha (2023). Rumus Luas Trapesium
[10] Suatan, R. A., Giriantari, I. D., & Sukreyasa, I. (2020). Kajian Ekonomi Rencana PLTMH di Desa Panji. Majalah Ilmiah Teknologi Elektro, 19, 263-270.
[11] Alaydrus , Muhhamad bagir. (2020). Noncircular Conduit.
[12] Damarian, K. D., Giriantari, I. D., & Jati, I. (2023). Studi Kelayakan Ekonomi Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) di Sungai Yeh Dikis banjar Lebah Kabupaten tabanan. Junal SPEKTRUM, 26-34.
[13] Giatman, M. (1970). Ekonomi Teknik. Jakarta: SCRIBD. Retrieved from Universitas Udayana Library.
[14] Riadi, Muchlisin. (2021). Pembangkit Listrik Tenaga Mikro Hidro (PLTMH). Kajianpustaka.com. https://www.kajianpustaka.com/2016/10/pembangkit-listrik-tenaga-mikro-hidro.html
[15] Lazuardi. L., Rizza. M. A., Maryono. M. (2024). Application planning of microhydro electricity generating technology with 55 kw power in the mountains using the river flow of coban rondo waterfall, krajaan, pandesari, kec. Pujon, malang, east jawa. https://www.researchgate.net/figure/Tanaka-suiryoku-Turbine-selection-chart_fig1_385826974
[16] PLN. (2024). Penetapan Penyesuaian Tarif Tenaga Listrik (Tariff Adjusment) Oktober – Desember 2024.
[17] PERMEN ESDM No. 4 th 2020 Pasal 7 ayat 4 butir a. nomor 1. Tentang Perubaha Kedua atas Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 50 tahun 2017 tentang Pemanfaatan Sumber Energi Terbarukan Untuk Penyediaan Tenaga Listrik.
[18] Fauziyah, N. (2017). Perancangan Pembangkit Listrik Tenaga Mikro Hidro Dengan Turbin Cross Flow Menggunakan Generator DC Magnet Permanen. Retrieved from Repository.its.ac.id: https://repository.its.ac.id/48118/1/2214039029-Non_Degree.pdf .
[19] Indonesia, B (2019-2023). Data Inflasi. Retrieved Jul,I 3, 2024, from https://www.bi.go.id/id/statistik/indikator/data-inflasi.aspx
[20] Indonesia, B. (2024). BI-Rate. Retrieved Januari 5, 2025, from https://www.bi.go.id/id/statistik/indikator/bi-rate.aspx
[21] Leba, G. I. M., Setiawan, I. N., Sukerayasa, I. W., Ariastina, W. G., Giriantari, I. A. D., Kumara, I. N. S. (2024). Analisis Ekonomi Sistem PLTMH dan Pompa Air Sungai Yeh Ha di Kabupaten Karangasem. Jurnal SPEKTRUM, 246-255.


This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
This work is licensed under a Creative Commons Attribution 4.0 International License