PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA SEBAGAI CATU DAYA PADA SISTEM POMPA AIR DI SUMUR BOR ABIANSEKA II

Main Article Content

I Gusti Putu Ananta Mahanata Ida Ayu Dwi Giriantari I Nyoman Setiawan

Abstract

To accelerate the increase in the use of New Renewable Energy (EBT) in Bali Province in accordance with the General Regional Energy Plan (RUED), the Bali Provincial Government issued Bali Governor Circular Letter (SE) Number 5 of 2022. One of the applications of this letter is investment planning and analysis installation of a Solar Power Plant (PLTS) at the Abianseka II drilled well in Batuan Kaler Village, Gianyar. The Abianseka II drilled well is equipped with 4 pumps which on average consume 25,093.33 kWh of electricity per month. Based on the survey, the land available at the Abianseka II drilled well is sufficient for the installation of Ground Mounted PLTS covering an area of 478.5 m2. Therefore, it was decided to use 83 Jinko Solar JKM610N-78HL4-V 610 Wp modules with a total capacity of 50.6 kWp, as well as 1 LivoLtek 60 kW inverter and PLTS are capable of producing annual energy of 82,783 MWh, and have a performance ratio of 82.3%.

Downloads

Download data is not yet available.

Article Details

How to Cite
ANANTA MAHANATA, I Gusti Putu; DWI GIRIANTARI, Ida Ayu; SETIAWAN, I Nyoman. PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA SEBAGAI CATU DAYA PADA SISTEM POMPA AIR DI SUMUR BOR ABIANSEKA II. Jurnal SPEKTRUM, [S.l.], v. 11, n. 2, p. 125-129, june 2024. ISSN 2684-9186. Available at: <https://ojs.unud.ac.id/index.php/spektrum/article/view/117909>. Date accessed: 19 oct. 2024.
Section
Articles

Most read articles by the same author(s)

<< < 1 2 3 4 5 6 7 > >>