Warning: file_get_contents(https://ojs.journalbusiness.my/ojs.php): failed to open stream: HTTP request failed! HTTP/1.1 404 Not Found in /var/www/ojs.unud.ac.id_backup/lib/pkp/includes/functions.inc.php on line 4 Neli Lestari, Ni Made, Satya Kumara, I Nyoman, AND Dwi Giriantari, Ida Ayu. " REVIEW STATUS PANEL SURYA DI INDONESIA MENUJU REALISASI KAPASITAS PLTS NASIONAL 6500 MW" Jurnal SPEKTRUM [Online], Volume 8 Number 1 (27 March 2021)