Warning: file_get_contents(https://ojs.journalbusiness.my/ojs.php): failed to open stream: HTTP request failed! HTTP/1.1 404 Not Found in /var/www/ojs.unud.ac.id_backup/lib/pkp/includes/functions.inc.php on line 4 Pawitra Putra, A., Kumara, I., & Ariastina, W. (2020). Review Perkembangan PLTS di Provinsi Bali Menuju Target Kapasitas 108 MW Tahun 2025. Majalah Ilmiah Teknologi Elektro, 19(2), 181-188. doi:10.24843/MITE.2020.v19i02.P09