PAWITRA PUTRA, A.A. Gede Ari; KUMARA, I.N.S.; ARIASTINA, W. G..
Review Perkembangan PLTS di Provinsi Bali Menuju Target Kapasitas 108 MW Tahun 2025.
Majalah Ilmiah Teknologi Elektro, [S.l.], v. 19, n. 2, p. 181-188, dec. 2020.
ISSN 2503-2372.
Available at: <https://ojs.unud.ac.id/index.php/jte/article/view/61151>. Date accessed: 20 apr. 2024.
doi: https://doi.org/10.24843/MITE.2020.v19i02.P09.