FREDERIKA, Ariany; WIRANATA, A.A.; LARASATI, Kadek Riska.
PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN BALOK STRUKTUR BETON GEDUNG ANTARA METODE KONVENSIONAL DENGAN PRECAST (STUDI KASUS: GRAND WHIZ HOTEL, GATOT SUBROTO BARAT).
Jurnal Ilmiah Teknik Sipil, [S.l.], july 2014.
ISSN 2541-5484.
Available at: <https://ojs.unud.ac.id/index.php/jits/article/view/30555>. Date accessed: 23 feb. 2025.