FREDERIKA, Ariany; WIRANATA, A.A.; LARASATI, Kadek Riska. PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN BALOK STRUKTUR BETON GEDUNG ANTARA METODE KONVENSIONAL DENGAN PRECAST (STUDI KASUS: GRAND WHIZ HOTEL, GATOT SUBROTO BARAT). Jurnal Ilmiah Teknik Sipil, [S.l.], july 2014. ISSN 2541-5484. Available at: <https://ojs.unud.ac.id/index.php/jits/article/view/30555>. Date accessed: 05 may 2024.