SUKANIA, I Wayan; GUNAWAN, Teddy.
Analisa Waktu Baku Elemen Kerja pada Pekerjaan Penempelan Cutting Stiker di CV Cahaya Thesani.
Jurnal Energi Dan Manufaktur, [S.l.], v. 7, n. 2, july 2015.
ISSN 2541-5328.
Available at: <https://ojs.unud.ac.id/index.php/jem/article/view/14211>. Date accessed: 21 may 2025.