The micro hydro power plant (PLTMH) in Banjar Dinas Mekar Sari, was built independently by community groups in 1980. With the use of traditional technology, the efficiency of PLTMH is low, so it is necessary to re-plan for PLTMH Banjar Dinas Mekar Sari to operate more optimally.. One of the most important factors in planning is financial / economic factors. This factor will be used to assess a plan whether it is feasible to build or not. The parameters used in determining economic factors are Net Present Value (NPV, Internal Rate of Return (IRR), Benefit to Cost Ratio (BCR), Life Cycle Cost (LCC), and Break Even Point (BEP). Economic feasibility analysis has been carried out. for planning PLTMH Banjar Dinas Mekar Sari obtained, BCR of 0.23 and -0.08 and NPV value of Rp.476,747,506 and -Rp.161,451,546 are positive when the discount rate is 10% and negative when the discount value is 12%, and the amount of the IRR value 1% and 0% do not exceed Indonesia's Expected Annual Rate of Return, which is 14.6%, and the amount of BEP units that must be sold to reach a cash flow point is Rp. 0 of 2,294,914.96 kWh, and the amount of payback period at This project is 2 years 2 months. So seen from the existing economic parameters, the design of PLTMH in Banjar Dinas Mekar Sari is not feasible from an economic point of view because the large profits obtained from the design of PLTMH Banjar Dinas Bembang Sari do not exceed the initial start. al cost (investment cost).

Downloads

Download data is not yet available.

References

[1] Keputusan Menteri Energi dan Sumber Daya Mineral No. 39
K/20/MEM/2019. Tentang Pengesahan Rencana Usaha Penyediaan
Tenaga Listrik PT Perusahaan Listrik Negara (Persero) Tahun 2019
Sampai Dengan Tahun 2028.
[2] Kementrian Energi Dan Sumber Daya Mineral. 2016. Jurnal Energi
Media Komunikasi Kementerian Energi dan Sumber Daya Mineral.
[3] Balitbang ESDM. 2017. Ketenagalistrikan dan EBTIKE, Mikrohido.
Jakarta : Kementrian ESDM
[4] Dutch-German Partnership Energising Development Mini Hydro
Power Project. Panduan Singkat Pengembangan Pembangkit Listrik
Tenaga Mikrohidro (PLTMH). Jakarta : Kementrian ESDM
[5] Coaction. 2019. https://coaction.id/air-sebagai-sumber-energiterbarukan/.
Jakarta : Collaborate Advocate Breaking Barriers.
[6] Balai Wilayah Sungai Bali-Penida. Data Tukad Banyumala, Tukad
Pasut. Bali : Kementrian PUPR.
[7] Widiana, Nengah. 2020. Perancangan Penstok (Pipa Peesat) Untuk
Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Di Banjar Dinas
Mekarsari, Desa Panji, Kecamatan Sukasada, Kabupaten Buleleng.
Bali : Universitas Udayana
[8] IMIDAP. 2009. PEDOMAN STUDI KELAYAKAN EKONOMI /
FINANSIAL. Jakarta : Kementrian ESDM.
[9] Barringer & Weber. 1996. Life Cycle Cost Tutorial. Fifth International
Conference on Process Plant Reliability.
[10] Ulfathu, Vivin. 2016. Analisis Break Even Point Sebagai Alat
Perencanaan Penjualan Pada Tingkat Laba Yang Diharapkan (Studi
Kasus pada Perhutani Plywood Industri Kediri Tahun 2013-2014).
Jurnal Administrasi Bisnis (JAB), Vol. 35 No. 1 hal. 196-206.
[11] Focus, Guru. 2020. Buffett Indicator: Indonesia Stock Market
Valuations and Expected Future Returns.
[12] Abdul Choliq. (2004:59). “Pengertian payback period” diakses dari
https://rumus.co.id/rumus-paybackperiod/#
Cara_Menghitung_Payback_Period
[13] Laksana, Ari. 2020. Redesain Turbin 175 kW Untuk Pembangkit
Listrik Tenaga Mikrrohidro PLTMH Desa Mekar Sari Buleleng Bali.
Bali : Univesrsitas Udayana
[14] Aprilyanto, Eka. 2020. Perencanaan Sistem Kelistrikan Pembangkit
Listrik Tenaga Mikrohidro Di Banjar Dinas Mekar Sari, Desa Panji
Kecamatan Sukasada, Kabupaten Buleleng. Bali : Universitas Udayana.
[15] PERMEN ESDM No. 4 th. 2020 Pasal 7 ayat 4 butir a. nomor 1.
Tentang Perubahan Kedua atas Peraturan Menteri Energi dan Sumber
Daya Mineral Nomor 50 tahun 2017 tentang Pemanfaatan Sumber
Energi Terbarukan Untuk Penyediaan Tenaga Listrik.
[16] Suatan, Richard. 2020. Kajian Ekonomi Perencanaan Pembangkit
Listrik Tenaga Mikrohidro (PLTMH) di Banjar Dinas Mekar Sari Desa
Panji Kecamatan Sukasada Kabupaten Buleleng. Bali: Universitas
Udayana.
[17] IRENA. 2012. Renewable Energy Technologies: Cost Analysis
Series. Irena Working Paper.
[18] PERGUB BALI No. 6 Tahun 2009 Pasal 1 Ayat 2 butir b. Tentang
Harga Dasar Air Pengenaan Pajak Pengambilan dan Pemanfaatan Air
Bawah Tanah Dan Air Permukaan. Bali : PemProv. Bali.
[19] PERMEN ESDM No. 12 th. 2017. Tentang Pemanfaatan Sumber
Energi Terbarukan Untuk Penyediaan Tenaga Listrik.
[20] Moonti, Usman. 2016. Bahan Ajar Mata Kuliah Dasar - Dasar
Koperasi.
[21] PERGUB BALI No. 45 th. 2019. Tentang Bali Energi Bersih. Bali :
Pemerintahan Provinsi Bali.
Published
2020-12-31
How to Cite
SUATAN, Richard Antony; GIRIANTARI, Ida Ayu Dwi; SUKERAYASA, I Wayan. Kajian Ekonomi Rencana PLTMH di Desa Panji. Majalah Ilmiah Teknologi Elektro, [S.l.], v. 19, n. 2, p. 263-270, dec. 2020. ISSN 2503-2372. Available at: <https://ojs.unud.ac.id/index.php/jte/article/view/66996>. Date accessed: 29 mar. 2024. doi: https://doi.org/10.24843/MITE.2020.v19i02.P20.