FREDERIKA, Ariany.
ANALISIS PERCEPATAN PELAKSANAAN DENGAN MENAMBAH JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI (Studi Kasus: Proyek Pembangunan Super Villa, Peti Tenget-Badung).
Jurnal Ilmiah Teknik Sipil, [S.l.], nov. 2012.
ISSN 2541-5484.
Available at: <http://ojs.unud.ac.id/index.php/jits/article/view/3653>. Date accessed: 13 aug. 2025.